Post by tomcasper745 on Dec 14, 2017 1:37:57 GMT 10
Short term objectives for reduction of environmental impact of any process are: Reduced consumption of resources Reduction of emissions and other byproducts of the process to air, water and land Reduction of production (of waste) and increased recycling of waste. Contractor working on a long term project should monitor his activities to minimize the consumption of energy resources and other items for the sake of ecosystem. INITIAL GROUND CONTAMINATION Initial ground contamination, if any, and its extent should be established during soil investigation. If contamination is found, necessary actions should be enforced to restore a polluted site to a condition suitable for execution of construction work safely.
|
|
|
Post by jackychung on Dec 26, 2017 18:14:32 GMT 10
Proper trimming can improve the health of your trees by eliminating branches that are dead or dying.
|
|